Method of statement for mechanical works pdf

During the works access to the scaffold will be via ladder which will be tied off at the top, ladders will be removed or boarded off at the end of each shif. Method Statement free download. Fixing Conduits and GI boxes in the columns.


Before casting any column in the site, we have to check if there is any Switch Socket, bell or break glass fixed on the column. Commencement and duration of works will be detailed on the Site Programme. A method statement for various hvac installation works. Site Supervisor to ensure that everybody is completely aware of the scope of works and have read this method statement and are familiar with the reporting and emergency procedures 8. All supporting documentation should be read prior to works i. Erect all necessary signage to serve. Hi, it was very informative post.


Thank you for sharing with us. I think nowadays middle-east companies like alboom groups helping customers to procure all necessary equipment’s and materials for Fabrication and erection of piping with the most competitive and reliable materials in terms of cost and quality. ITP Mechanical (2) LEED (3). LEED green associate Vpractice exams $ 5. Brazing Procedure Specific. The following method statement has been developed to provide a safe system of work and must be adhered to at all times, any significant deviation from this system must first be authorised by your manager or safety representative.


This section includes method statements specific to electrical and mechanical works , such as air conditioning repairs and maintenance. Contains full sequences of. All excavated materials to be deposited into designated skips at end of each operation by mechanical means i. If above performed by manual method the items are to be broken down into small sections – lifting not to exceed 20kg.


AiThe objectives is to describe Plumping works associated with installation of internal pipes in compliance with the contract specification, approved shop drawings, combine and coordinated all services and structural penetration shop drawings. There are certain erection practices which are in general use and have proven sound over the years. STATEMENT OF WORK SECTION 1. Scope This method of statement is applicable for installation of Pipe works at high level for drainage pipe works. Mark out the location of hanger thread rods for pipe installation as per the approved construction drawing.


Method of statement for mechanical works pdf

Installation Procedure 3. Drill the marked position for hangers and supports by using the drill bit of appropriate size. While a method statement will usually be accompanied by one or more risk assessments, these two types of documents are not the same thing, for more information read about the difference between risk assessments and method. During the proposed works the existing heat exchangers are planned to be removed from site and the existing buffer vessels require modifications. All the above works are described in detail within the later sections of this specification along with the Mechanical and Electrical tender drawings. INTRODUCTION AND PURPOSE 1. This specification covers the installation, testing and pre-commissioning of mechanical equipment.


Ductwork is an MEP work, if you are a quality engineer working in MEP contracting, this method statement is for you. Ductwork is a huge part of the work in a construction of a high-rise building project even in a low-medium rise. Scope of Work The purpose of this method statement is to describe the measures and. SCOPE OF THE WORKS.


This General Specification, Particular Specification, Tender Equipment Schedule and Drawings detail the performance requirement s of the Work s. To co –ordinate with the Main contractor, MEP Coordinator and Safety Officer, for a safe and proper execution of the works. To ensure that the works are carried out according to the Contract Specifications, approved method statement and the shop drawings. Ensured that the proper clearance is available from civil side before commencement of works.


Relocation of Yiu Lian Floating Dock No.